The Cacao Estate at NOVUS
Floor Plan  ›  Bar & Back Bar  ›  Review vs. NOVUS BOH

Front & Back Bar Review

What to add, change, or delete now that Food Prep, Choco Prep, and Wash rooms are spec’d · May 11, 2026

Back to Floor Plan

About this review

The Front Bar and Back Bar equipment docs in your hands were written before the May 9 NOVUS layout introduced four BOH rooms with their own equipment: a 12′ × 10′ Chocolate Prep, an 8′ × 10′ Food Prep, a 9′ × 10′ Wash, and a 5′ × 8′ Office. Three of those rooms — Choco Prep, Food Prep, and Wash — directly affect what the bar needs to carry.

The food menu was also rewritten on May 9 and is now substantially heavier on cold-station composed plates (charcuterie, cheese, brie en croûte, smoked salmon tartine, hummus) plus a real Sunday brunch (bagels, eggs benedict, tartines, parfaits, brioche). That menu lives in the Food Prep room, not on the bar.

This document walks the front bar and back bar slot by slot, asks the question “is this still right?”, and lists every add, change, and delete. Where the answer is “no change”, that is called out too — most slots are still right, the BOH additions reduce duplication rather than create it.

Headline Findings

The short version

  1. No deletions on the front bar. The 3-comp, glasswasher, hand sink, ice bin, froster, and two refrigeration units all still earn their slots.
  2. One change on the front bar — repurpose the 48″ dual-zone fridge (Slot 3) entirely to wine. The cold zone no longer needs to carry cocktail mise/dairy; the Food Prep UC fridge does that now.
  3. Two changes on the back bar — repurpose Reach-in #1 (Slot 5) from charcuterie/mise to cocktail mise and back-up wine, and add a French press to the coffee station (Slot 1) for Sunday brunch.
  4. One real addition — a Type II hood / no-hood decision in the Food Prep room creates an unrelated knock-on for the bar’s Bunn HW2 (it shares an electrical circuit class). Confirm panel capacity with the GC.
  5. Net cost impact — slightly negative. Reach-in #1 use-case change saves nothing on capital but recovers ~$400/year on cocktail mise spoilage. The French press add is $80–120.

Front Bar — Slot-by-Slot Review

Layout reference: 20-foot front bar, west-to-east as bartender sees it. Seven equipment slots plus two millwork slots (clean landing, stem storage).

#SlotAllocatedStatusWhy
1 Hand sink (Krowne HS-1317) 12″ No change NC code requires dedicated bar handwash regardless of BOH hand sinks.
2 Wine preservation (Wineemotion OTTO 8-bottle) 30″ No change Whites + rosé BTG dispenser — the heart of the wine program. Nothing in BOH replaces this.
3 48″ dual-zone wine fridge (Perlick HC48RW) 48″ Change use Move both zones to wine. Cold zone no longer needs to carry citrus/dairy/mise — Food Prep UC fridge does that. See detail below.
4 Ice bin with cold plate (Krowne 18-24-7) 24″ No change Cocktail ice + dump. Not duplicated anywhere in BOH.
5 Glass froster (Perlick FR24RT) 24″ No change Stemware chilling. BOH has no stemware refrigeration.
6 3-comp underbar sink (Krowne KR24-33C) 36″ No change — read note BOH wash room now has a 90″ 3-comp with drainboards. Front bar 3-comp is still NC-required for bar service — shakers, ice dump, cocktail tool washing.
7 Bar glasswasher (CMA 181GW) 24″ No change Stemware never goes to BOH dishwasher under the operational model — stays at the bar.

The one change — Slot 3 (48″ dual-zone fridge)

The 48″ Perlick HC48RW was originally specified as dual-zone (34–42°F refrigerator side + 40–65°F wine side) so it could carry cocktail mise/citrus/dairy on the cold side and bottle-service wine on the wine side. That dual role made sense when the only refrigeration in the entire BOH for non-chocolate items was the wash room (none) and the bar (everything).

With the NOVUS Food Prep room now spec’d with a dedicated 24″ True TUC-24-HC under-counter refrigerator (33–38°F) for brunch and hors d’oeuvres mise en place, the cold zone on the front-bar fridge is doing duplicate duty. The Food Prep UC fridge is closer to where charcuterie/cheese/brie/smoked salmon get plated, so it makes more sense to hold them there.

Recommended change

The almost-change — Slot 6 (3-comp underbar sink)

Worth raising even though the answer is “no change”. With a 90″ 3-comp + dual drainboards in the wash room, the front bar’s 36″ Krowne KR24-33C is no longer doing bulk plate/charcuterie wash. The wash room handles that. So why keep 36″ of 3-comp at the bar?

Because NC code still requires a 3-comp at the bar service area for any wares that get washed there — and the bar will wash a lot. Cocktail shakers, mixing glasses, ice dump, bar tools, the occasional rocks glass that came back with citrus pulp the dishwasher won’t reach. The smallest commercial-grade 3-comp underbar sink that exists in catalog is the 36″ Krowne KR24-33C with 10″-deep bowls. Going smaller means custom fabrication ($2,500–3,800), longer lead time, and smaller bowls that struggle with Boston-shaker dump duty.

Net: keep the 36″ Krowne, same recommendation as before. The point of the BOH 3-comp is that it gets the plate/charcuterie/sheet-pan duty off the bar — but the bar still keeps its own.

Back Bar — Slot-by-Slot Review

Layout reference: 20-foot back bar, working wall behind the bartender. Five equipment slots plus the 140″ marble/quartz pastry slab (millwork).

#SlotAllocatedStatusWhy
1 Coffee station (Hario + Aeropress + Baratza) 12″ Add French press Brunch menu lists French press as a “To Sip” item — currently no equipment specified for it. Add a Bodum Chambord 8-cup, ~$50. See detail.
2 Hot water dispenser (Bunn HW2) 12″ No change Used for hot chocolate, tea, Aeropress, brunch French-press base water. More needed now, not less.
3 Induction burner (Vollrath 59500P) 14″ No change — KEEP Even though Food Prep also has a Vollrath 59500P, evening hot chocolate orders during winter happen at the bar in front of the guest. See detail.
4 Marble / quartz pastry slab (Caesarstone) 140″ No change The visual centerpiece + chocolate flight plating + cocktail prep. Irreplaceable.
5 Reach-in #1 (Perlick HC24RS) 24″ Change use Repurpose from charcuterie/mise to cocktail mise + wine backup. Charcuterie now lives in Food Prep. See detail.
6 Reach-in #2 (Perlick HP24WS) 24″ No change Reds at 58°F + Coravin. Closest fridge to the bartender’s working hand. Stays.

The first change — Slot 1 (add French press to coffee station)

The May 9 brunch menu, under “To Sip”, lists “French press” alongside cold brew, mimosas, bellini, and sparkling. That is a real menu commitment, but the back bar coffee station as currently specified does not include a French press. Cold brew is covered by the Hario Mizudashi; single-cup hot coffee is covered by the Aeropress; but two-to-four-person French press service for a brunch table requires an actual French press.

This is a $50–100 add, not a major capital decision. Specifying it now is cleaner than discovering the gap on opening Sunday.

Bodum Chambord French press (Brunch addition)

Slot 1 add
Back-bar coffee station · 4″ diameter footprint · no electrical, no plumbing
Recommended — Bodum Chambord 8-cup (1.5L) French press × 2
ModelBodum Chambord 8-cup (1.5L), copper or chrome trim to match the back-bar finish
Price (est.)$50–80 per unit. Buy two — one in service, one in rotation / backup. Total $100–160.
Footprint4″ diameter × 9″ tall. Lives on the marble slab between service or in under-counter shelving. Does not require new bar real estate.
CoffeeUse the same coarse-grind setting on the Baratza Encore already at the coffee station. One grinder serves all three brewing methods (cold brew, Aeropress, French press) at different grind settings.
WaterThe Bunn HW2 dispenses at 200°F — perfect for French press. No additional water source needed.
Why this oneThe Chambord is the canonical French press — borosilicate glass beaker, stainless mesh, copper or chrome trim. Fits the warm/wood Bali aesthetic of the back bar. Bodum sells spare parts (mesh, glass beaker) for the inevitable replacement.

The second change — Slot 5 (Reach-in #1, repurpose)

Reach-in #1 was originally specified as a 24″ Perlick HC24RS holding charcuterie, cheese, prepped fruit, garnishes, and any cocktail mise needing refrigeration. The operational logic was: bartender plates chocolate flights and small cheese/charcuterie at the bar, needs immediate access to those ingredients.

That logic has changed. The May 9 Food Prep room takes over all charcuterie and cheese plating. Cheese boards, charcuterie boards, brie en croûte, smoked salmon tartine, hummus, fruit & cheese plates — all assembled in Food Prep, run to the table by FOH. The bartender does not plate these. Charcuterie and cheese now live in the Food Prep UC fridge, not at the bar.

What does the bartender still need at hand? Cocktail mise — citrus (lemons, oranges for peel and juice), garnishes (mint, fresh rosemary, fennel fronds), cocktail dairy (heavy cream for the rare cream cocktail, half-and-half for after-dinner coffee), opened cordials and syrups, prepped pre-batched cocktails for a busy night. Plus the chocolate-pairing items the bartender does still plate at the marble slab: the bonbons themselves (which live in the front-of-house chocolate display case), and any side accompaniments the chocolatier preps.

Recommended new use

What this resolves

Three things:

The keep-don’t-cut decision — Slot 3 (back-bar induction burner)

Worth flagging because the Food Prep room now has its own Vollrath 59500P induction burner (Slot 6 in the Food Prep equipment spec). Why pay for two of the same unit?

Three reasons keep the back-bar one:

Two of the same unit is correct here. They serve different shifts. Don’t cut it.

Knock-on Items Worth Flagging

Three things that aren’t direct bar equipment changes but affect bar planning given the NOVUS BOH additions.

1. Electrical panel capacity — confirm with GC

The Food Prep room adds six dedicated 15A circuits + one 30A circuit + one 240V mini-split circuit. The Chocolate Prep room already has its mini-split, dehumidifier, tempering machine, two UC fridges, and reach-in. The Wash room has the dishwasher (30A/208V), hot water heater, hand sink, mop sink. The Bar has seven powered units already — OTTO (240V), HC48RW, ice bin (drain only), froster, 3-comp (drain only), glasswasher (240V/hot water), plus the back bar’s Bunn HW2, induction burner, two reach-ins.

That is a real electrical load aggregating into the panel. Worth confirming with the GC’s electrical sub that the panel capacity is sufficient — and specifically that the back-bar Bunn HW2 doesn’t end up on a shared circuit with the front-bar OTTO. Both are continuously-energized appliances; sharing a circuit with peak draw on both will trip breakers.

2. Sparkling preservation for brunch — bar handles it, kitchen doesn’t

The brunch menu features mimosas and bellini, both of which need sparkling wine as the base. Sparkling preservation is in the front-bar wine fridge under stoppers (per Vol. II §7 and the May 2 session). The Food Prep room has no wine refrigeration — and shouldn’t. So all brunch sparkling service flows through the bar.

Operationally this means: brunch order ticket fires “Mimosa” at table 4, bartender pulls the sparkling from the front-bar fridge, pours orange juice from the Food Prep UC fridge (or staged at the bar in a half-gallon carafe at start of service), and runs the drink. Standard wine-bar workflow, nothing exotic. Just worth being explicit that the brunch sparkling path is bar → table, not kitchen → table.

Implication: stage one Champagne flute rack on the back-bar marble slab at brunch service start, pre-frosted. Have one or two carafes of OJ and one of peach purée (for bellini) prepped in Food Prep and staged on the back bar at 8am.

3. Espresso machine at Food Prep — still deferred

The Vol. II §13 open-items list flagged the espresso machine question — bar or food prep room, or skip entirely. The current state of the documents is:

The May 9 brunch menu doesn’t list any espresso-based drinks (no cappuccino, no latte, no espresso martini despite the Cacao Martini being on the evening menu). This is consistent — the no-espresso position is held. Revisit at 3 months post-opening based on actual brunch demand. No action needed now.

Updated Buy-List — What to Add to the Order

The vast majority of the bar equipment list is unchanged. This table shows only the deltas from the current Front Bar and Back Bar docs.

Action Item What changes Capital impact Decision owner
Add Bodum Chambord 8-cup French press × 2 Brunch “To Sip” menu lists French press; not previously equipped. +$100–160 Bartender / GM
Change use Slot 3 (front bar) — Perlick HC48RW 48″ dual-zone Both zones to wine service temps (40–45°F + 50–55°F). No cocktail mise here. $0 — software setting GM / Bev Director
Change use Slot 5 (back bar) — Perlick HC24RS 24″ UC fridge Repurpose from charcuterie/mise to cocktail mise + wine backup. Same equipment. $0 — operational GM / Bev Director
Confirm Electrical panel sizing across all rooms BOH adds 8+ circuits including 30A and 240V. Verify panel and circuit assignments — bar Bunn HW2 must not share with bar OTTO. $0–4,000 GC / electrical
Confirm Front-bar / back-bar wine fridge double-count (open since May 2) This document resolves the double-count: front-bar = sparkling/whites/rosé, back-bar = reds. Sign off needed. $0 — both units already in buy-list GM / Bev Director
No change Slot 6 (front bar) — Krowne KR24-33C 36″ 3-comp BOH 3-comp absorbs plate/charcuterie volume, but bar 3-comp still NC code-required for shaker / ice / tool wash. $0
No change Slot 3 (back bar) — Vollrath 59500P induction Yes the Food Prep room has the same unit, but the back-bar one serves Wed–Sat evening hot chocolate / tableside warming when Food Prep is dark. $0

Net capital impact

$100–160 added (French press × 2). Zero deletions. Two use-case changes that cost nothing. One electrical confirmation that may or may not require a panel upgrade depending on what the GC discovers.

The front + back bar combined equipment line in the Vol. II §12 budget was $53,000–79,000. The current buy-list totals $43,025–54,565 (per the Back Bar doc summary). Adding the French press brings it to $43,125–54,725. Comfortably inside budget, $25K of headroom in the line for smallwares and contingency.

Items Still to Confirm Before Placing Orders

Carrying forward from the original docs plus what this review adds:

From the original docs (still open)

New from this review

Visual Summary — What Changed Where

Front bar — 20-foot, west to east
Hand sink12″ Wine pres.30″ Wine fridge
(now wine-only)48″
Ice bin24″ Glass froster24″ 3-comp sink36″ Glasswasher24″ Clean landing12″ Stem storage24″

unchanged use-case change (no equipment change)

Back bar — 20-foot, west to east
Coffee station
+ French press12″
Hot water
(Bunn HW2)12″
Induction
burner14″
Marble / quartz pastry slab
chocolate flight plating + cocktail prep140″
Reach-in #1
cocktail mise
+ wine backup24″
Reach-in #2
reds 58°F24″

unchanged use-case or addition change

Cacao Cellars · Front & Back Bar Review against NOVUS BOH · May 11, 2026
Back to Floor Plan